A contemporized mid-century inspired luminaire featuring geometric aged brass finished cylinders. This innovative design set in a wave suggests movement when viewed from various angles for a gracious statement over a long table or as room dividers when displayed in multiples at upscale establishments.
- CRI: 90
- Input: 120-277 VAC, 50/60Hz
- ELV Dimming: 100-10%
- 0-10V Dimming: 100-5%
- TRIAC Dimming: 100-10%
- Rated Life: 66000 Hours
- Thin powered aircraft cables provide an ultra clean look for adjustable suspension height
- Can be mounted on a sloped ceiling
- Driver concealed within the canopy
Note: This item has been marked as Retired by the manufacturer. Verify availability before promoting.